[1]
2021. WORKERS IN THE CONSTRUCTION OF ITAIPU HYDROELECTRIC POWER PLANT (1974-1985): THE FRONTIER BETWEEN WORK AND SYMBOLIC CONTROL MECHANISMS. RECIMA21 - Revista Científica Multidisciplinar - ISSN 2675-6218. 2, 3 (Apr. 2021), 96–104. DOI:https://doi.org/10.47820/recima21.v2i3.145.