(1)
WORKERS IN THE CONSTRUCTION OF ITAIPU HYDROELECTRIC POWER PLANT (1974-1985): THE FRONTIER BETWEEN WORK AND SYMBOLIC CONTROL MECHANISMS. RECIMA21 2021, 2 (3), 96-104. https://doi.org/10.47820/recima21.v2i3.145.