INFRASTRUCTURE, CYCLE TIME AND QUEUES IN 70-t TRUCK HAULAGE IN AN IRON ORE MINE

Abstract

Truck haulage accounts for the largest share of operating costs in open-pit mines. This study evaluates cycle times and productivity of a fleet of 70-t rigid trucks in an iron ore mine in the Iron Quadrangle, Brazil, before and after interventions completed by April 2026: segregation of mine roads from community roads, upgrading of roads and working areas, geometric design criteria for wide-body trucks, telemetry and a rainy-season plan. A total of 46,267 dispatch cycles were analysed using regression with route fixed effects. On the same routes, loading time fell by 21.6%, mainly associated with larger excavators, and manoeuvring times by about 55%, reducing the cycle time excluding queues by 9.5%. Queues, however, increased by 2.8 minutes per cycle as the fleet expanded, and productivity per truck remained stable. A match factor below 1 in every month indicates that queues are associated with loading–hauling synchronisation rather than lack of loading capacity. Removing the additional queuing would represent a theoretical productivity potential of 11.6%.

Author Biographies

Ramon da Silva Gomes, Federal University of Catalao

Production Engineer, specialist in Occupational Safety Engineering, and postgraduate student in Mining and Mine Planning at the Federal University of Catalão (UFCat), with experience in open-pit mining operations.

Leandro de Vilhena Costa, Federal University of Catalao

PhD in Mineral Engineering from the Federal University of Ouro Preto (UFOP). Professor at the Academic Unit of Engineering of the Federal University of Catalão (UFCat), specializing in Mining and Mine Planning, and coordinator of the institution's Graduate Specialization Program in Mining and Mine Planning. Has experience in mining operations and mine planning.

References

ALARIE, S.; GAMACHE, M. Overview of solution strategies used in truck dispatching systems for open pit mines. International Journal of Surface Mining, Reclamation and Environment, v. 16, n. 1, p. 59-76, 2002 DOI: https://doi.org/10.1076/ijsm.16.1.59.3408 DOI: https://doi.org/10.1076/ijsm.16.1.59.3408

ASSOCIAÇÃO BRASILEIRA DE NORMAS TÉCNICAS. ABNT NBR ISO 31000: gestão de riscos: diretrizes. Rio de Janeiro: ABNT, 2018.

BRASIL. Ministério do Trabalho e Emprego. NR 22: segurança e saúde ocupacional na mineração. Redação dada pela Portaria MTE nº 261, de 12 de fevereiro de 2026. Brasília: MTE, 2026. Disponível em: https://www.gov.br/trabalho-e-emprego/pt-br/acesso-a-informacao/participacao-social/conselhos-e-orgaos-colegiados/comissao-tripartite-partitaria-permanente/normas-regulamentadora/normas-regulamentadoras-vigentes/nr-22-atualizada-2026.pdf Acesso em: 15 out. 2026.

BENEVENUTI, F. D.; PERONI, R. L. Detecting drainage pitfalls in open-pit mines and haul roads using UAV-photogrammetry. DYNA, v. 88, n. 216, p. 190-195, 2021 DOI: https://doi.org/10.15446/dyna.v88n216.90801 DOI: https://doi.org/10.15446/dyna.v88n216.90801

BURT, C. N.; CACCETTA, L. Equipment selection for surface mining: a review. Interfaces, v. 44, n. 2, p. 143-162, 2014 DOI: https://doi.org/10.1287/inte.2013.0732 DOI: https://doi.org/10.1287/inte.2013.0732

CATERPILLAR. Caterpillar performance handbook. 49. ed. Peoria: Caterpillar Inc., 2019.

CATERPILLAR. Rolling resistance factors. [S. l.]: Caterpillar, [s.d.]. Disponível em: https://www.cat.com/en_US/articles/ci-articles/rolling-resistance-factors.html Acesso em: 15 out. 2026.

ERCELEBI, S. G.; BASCETIN, A. Optimization of shovel-truck system for surface mining. Journal of the Southern African Institute of Mining and Metallurgy, v. 109, n. 7, p. 433-439, 2009.

HARTMAN, H. L.; MUTMANSKY, J. M. Introductory mining engineering. 2. ed. Hoboken: John Wiley & Sons, 2002.

HUSTRULID, W. A.; KUCHTA, M.; MARTIN, R. K. Open pit mine planning and design. 3. ed. Boca Raton: CRC Press, 2013.

KAUFMAN, W. W.; AULT, J. C. Design of surface mine haulage roads: a manual. Washington, DC: U.S. Bureau of Mines, 1977. (Information Circular, 8758).

MOHTASHAM, M.; MIRZAEI-NASIRABAD, H.; ASKARI-NASAB, H.; ALIZADEH, B. Truck fleet size selection in open-pit mines based on the match factor using a MINLP model. Mining Technology, v. 130, n. 3, p. 159-175, 2021 DOI: https://doi.org/10.1080/25726668.2021.1919374 DOI: https://doi.org/10.1080/25726668.2021.1919374

OLIVEIRA, P. T.; FONTES, M. P.; FELSCH JUNIOR, W. S. Aumento da produtividade da operação unitária de transporte através do uso de telemetria. Tecnologia em Metalurgia, Materiais e Mineração, v. 20, e2665, 2023 DOI: https://doi.org/10.4322/2176-1523.20222665 DOI: https://doi.org/10.4322/2176-1523.20222665

SHAKENOV, A. T. et al. Quasi-experimental field assessment of haul-road maintenance effects on fuel consumption, cycle time and mechanical loading of open-pit dump trucks. Applied Sciences, v. 16, n. 15, 7773, 2026 DOI: https://doi.org/10.3390/app16157773 DOI: https://doi.org/10.3390/app16157773

SILVA, P. G. C.; LIMA, H. M.; TORRES, V. F. N.; SILVEIRA, L. G. C.; SOUZA, F. R. Evaluation of road roughness and its influence on operating parameters in open-pit mines. Concilium, v. 24, n. 17, p. 654-670, 2024 DOI: https://doi.org/10.53660/CLM-3947-24R52 DOI: https://doi.org/10.53660/CLM-3947-24R52

TANNANT, D. D.; REGENSBURG, B. Guidelines for mine haul road design. Vancouver: University of British Columbia, 2001.

THOMPSON, R. J.; PERONI, R. L.; VISSER, A. T. Mining haul roads: theory and practice. Boca Raton: CRC Press, 2019.

How to Cite

Gomes, R. da S., & Costa, L. de V. (2026). INFRASTRUCTURE, CYCLE TIME AND QUEUES IN 70-t TRUCK HAULAGE IN AN IRON ORE MINE. RECIMA21 - Revista Científica Multidisciplinar, 7(11), e7119567. https://doi.org/10.47820/recima21.v7i11.9567
Crossmark logo

Similar Articles

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)