OPTIMIZATION OF THE FLEET SIZING SYSTEM IN OPEN-PIT DIAMOND MINES USING HAULSIM SOFTWARE: A STUDY FOCUSED ON REDUCING OPERATING COSTS AND INCREASING PRODUCTIVITY AT THE LUELE MINE

Abstract

This study analyzes the excavator–truck system at the Luele Mine in Angola, aiming to optimize haulage operations and determine the fleet size required to reduce operating costs and increase productivity. The research used operational data from 9 excavators and 58 trucks, including capacities, cycle times, mechanical availability, and utilization, to estimate the hourly productivity of loading and hauling equipment, considering an average haul distance of 4.2 km and an operating schedule of 630 hours per month. Analytical fleet sizing was complemented by discrete-event simulation using HAULSIM Software, with 30 replications, and the model was validated against field data. The results indicate an average productivity of 363 m³/h per excavator and 27.7 m³/h per truck. To meet a monthly volume of 1,000,000 m³, fleet sizing indicated a requirement for 5 excavators and 58 trucks: the installed truck fleet is optimal, with no spare capacity, whereas the excavator fleet has 4 units more than required. The simulation achieved 99.0% of the required production with 58 trucks, with deviations of up to 1.5% from field data. The monthly operating cost of the sized fleet was estimated at approximately USD 3.83 million (USD 3.83 per cubic meter), 8.7% lower than that of the current fleet. The study concludes that correctly interpreting excavator cycle times and consistently applying availability and utilization are crucial for fleet sizing and recommends validating the estimated parameters using data from the mine’s dispatch system.

Author Biographies

Arão Maleca António, Universidade Federal de Catalão

Specialist in Mine Planning. Federal University of Catalão. Bachelor in Mining Engineering from Lueji A’Nkonde University, Lunda Sul, surveyor and researcher in the field of geoscience.

Leandro De Vilhena Costa, Federal University of Ouro Preto

PhD in Mineral Engineering. Federal University of Catalão. PhD in Mining Engineering from the University of Ouro Preto and master with emphasis on underground mining.

References

CATERPILLAR PERFORMANCE HANDBOOK. Publication by Caterpillar Inc., Peoria, Illinois, U.S.A. FEBRUARY 2007

CHADWICK, John. Mining Equipment Management. Littleton: SME (Society for Mining, Metallurgy, and Exploration), 2010.

CHAOWASAKOO, Patarawan; SEPPÄLÄ, Heikki; KOIVO, Heikki; ZHOU, Quan. Digitalization of mine operations: Scenarios to benefit in real-time truck dispatching. International Journal of Mining Science and Technology, v. 27, n. 2, p. 229-236, 2017. DOI: https://doi.org/10.1016/j.ijmst.2017.01.007

CURI, Adilson; FELSCH, Walter Schmidt; RODOVALHO, E. Cunha; MEIRELES, B. Prado. Evaluation of haul trucks performance in a CSN mine. In: DREBENSTEDT, Carsten et al. (ed.). Mine planning and equipment selection. Cham: Springer, 2014. p

FELSCH, Walter. Por que aqueles caminhões estão parados? LinkedIn, 23 jul. 2026. Disponível em: [inserir o link da publicação]. Accesso em: 2 set. 2026.

MAY, Meredith Augusta. Applications of Queuing Theory for Open-Pit Truck/Shovel Haulage Systems. Blacksburg: Virginia Polytechnic Institute and State University, 2013.

MNZOOL, Mohammed; ALMUJIBAH, Hamad; BAKRI, Mudthir; GAAFAR, Ahmed; ELHASSAN, Adil A. M.; GOMAA, Ehab. Optimization of cycle time for loading and hauling trucks in open-pit mining. Mining of Mineral Deposits, v. 18, n. 1, p. 18-26, 2024. DOI: https://doi.org/10.33271/mining18.01.018

SILVA, Danilo José; COSTA, Leandro de Vilhena; SILVA, Fabiano Della Libera; ARCANJO, Silvia Helena de Souza. Análise comparativa de performance entre frotas de caminhões em uma mina de ouro a céu aberto. Revista Foco, v.17 n.12, p. 1-18, 2024. DOI: https://doi.org/10.54751/revistafoco.v17n12-111

SINGHAL, Raj (ed.). Mine planning and equipment selection: proceedings of the 22nd MPES Conference, Dresden, Germany, 14th–19th October 2013. Cham: Springer, 2014. p. 1143-1150 DOI: https://doi.org/10.1007/978-3-319-02678-7_111 DOI: https://doi.org/10.1007/978-3-319-02678-7_111

How to Cite

Maleca António, A., & Costa, L. D. V. (2026). OPTIMIZATION OF THE FLEET SIZING SYSTEM IN OPEN-PIT DIAMOND MINES USING HAULSIM SOFTWARE: A STUDY FOCUSED ON REDUCING OPERATING COSTS AND INCREASING PRODUCTIVITY AT THE LUELE MINE. RECIMA21 - Revista Científica Multidisciplinar, 7(11), e7119592. https://doi.org/10.47820/recima21.v7i11.9592
Crossmark logo

Similar Articles

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)