PRELIMINARY RISK ANALYSIS APPLIED IN ROUTINE MANAGEMENT IN A MARANHÃO RAILWAY COMPANY

Authors

DOI:

https://doi.org/10.47820/recima21.v3i9.1843

Keywords:

Reinforced Concrete, Methods and Techniques, Corrosion

Abstract

The Preliminary Risk Analysis (APR) tool is extremely important as part of the security management of companies, whatever the sector. The model in question provides transparency and supports the prior decision-making process to mitigate present risks that may impact the company's processes, thus aiming at the efficiency of safety in the methods of each area and also in people. It is worth mentioning that the industrial company scenario has been constantly investing in the safety of production and employees, since because it is a very vulnerable environment to low to very high risks, organizational management itself has applied methodologies that can mitigate problems of security risk as a whole. Therefore, the present work aims to share about the application of the concept of the Preliminary Risk Analysis tool in the shop floor environment through the methodology of bibliographic review, gathering knowledge of authors about the aforementioned tool.

Downloads

Download data is not yet available.

Author Biographies

Safirah Sousa Nunes

Discente do curso de engenharia de Produção da Universidade CEUMA - campus Imperatriz

Joilson Souza Santos

Discente do curso de engenharia de Produção da Universidade CEUMA - campus Imperatriz

Fernando Henrique Fernandes Sousa

Docente do Curso de Engenharia de Produção da Universidade CEUMA- Campus Imperatriz - MA

Frederico Figueiredo

Docente do Curso de Engenharia de Produção da Universidade CEUMA- Campus Imperatriz - MA

Diogo Ramon do Nascimento Brito

Docente do Curso de Engenharia de Produção da Universidade CEUMA- Campus Imperatriz - MA

References

ALVES, Nicole; TESSMANN, Letícia. Matriz de risco: Um estudo em uma empresa calçadista do vale do Paranhana. Rio Grande Do Sul, v. 7, n.2. jan. 2018.

BARBOSA FILHO, Antonio Nunes. Segurança do Trabalho e Gestão Ambiental. São Paulo, Editora ATLAS, 2001.

BENEDITO, Luis Felipe. Análise Preliminar De Risco (Apr) Em Uma Marcenaria Do Interior Do Estado De São Paulo. Universidade Tecnológica Federal do Paraná. 2019.

CHIAVENATO, I. Recursos humanos: o capital humano das organizações. 9. ed. Rio de Janeiro: Elsevier, 2009.

FERREIRA, Lucas. A Importância Do Profissional De Engenharia De Segurança Do Trabalho Para A Prevenção De Acidentes. João Pessoa, 2020.

GÓMEZ, T. C. (2010). Gerenciamento de riscos utilizando o PMBOK. 85 fls. (Monografia, Graduação em Ciência da Computação). Faculdade Lourenço Filho.

JUNIOR, Análise De Risco Aplicada À Segurança Do Trabalho Na Indústria De Petróleo E Gás. 2013.

INEE. Risco Residual. Disponível em: < https://inee.org/pt/eie-glossary/risco-residual>. Acesso em: 28, março, 2022.

MAIA, André. Análise Preliminar De Risco Em Uma Obra De Construção Civil. Rio Grande Do Norte, 2014.

SILVEIRA, Aline. Gerencia De Riscos - Método Apr: Um Estudo De Caso Em Uma Industria De Artigos De Decoração e Presentes. Universidade Do Sul De Santa Catarina. 2016.

PADOVEZE, Clóvis Luiz. Controladoria Estratégica e Operacional. 2. ed. São Paulo: Cengage Learning, 2009.

PATRICIO, Renato. Adequação do FMEA Para Gerenciamento De Riscos Em Obra De Infraestrutura, Após A Aplicação Da Análise Preliminar De Risco Na Execução De Muro De Gabião. Curitiba, 2017. 66 p (Monografia, especializando em Engenharia de Segurança Do Trabalho). Universidade Tecnológica Federal Do Paraná.

Published

04/09/2022

How to Cite

Nunes, S. S. ., Santos, J. S., Sousa, F. H. F., Figueiredo, F., & Brito, D. R. do N. (2022). PRELIMINARY RISK ANALYSIS APPLIED IN ROUTINE MANAGEMENT IN A MARANHÃO RAILWAY COMPANY. RECIMA21 - Revista Científica Multidisciplinar - ISSN 2675-6218, 3(9), e391843. https://doi.org/10.47820/recima21.v3i9.1843